initial cure meaning in Chinese
初期硫化
Examples
- Cure speed is fast . the time of initial cure is only 5minutes also in summer , 8 - 10minutes in winter . after 30minutes , the strength up to 80 % . post cure for 24h
硬化时间迅速,夏天5分钟左右即可初期固定,冬天则延至8 - 10分钟, 30分钟后可达80 %强度, 24小时后达到全力。 - Both initial curing temperature and final temperature of two systems moved to the peak temperature of the systems with addition of org - mmt , and the peak temperatures were kept constant
加入有机蒙脱土后,两个固化体系的起始固化温度和终止固化温度均明显向中间靠拢,而峰顶固化温度基本维持不变。